Superintendents Field Pack · Heavy Civil Field Templates

Paperwork that passes inspection, written by the field

Lift plans, JHAs, safety plans, and daily reports built by a Certified Lift Director with 28 years in heavy civil — substations, bridges, highways, light rail. Fill-in Word, Excel, and PDF files emailed to you after checkout and used on every job.

28 yrs
heavy civil field experience
CLD
Certified Lift Director
OSHA 30
+ rigging & signaling
17,946
man-hours without a reportable across his last three employers
Free

Try the Lift Plan Builder — free

Build a lift plan in minutes — gross load and % of chart capacity figured as you type, with Franklin's Five Checks built in.

Open the Builder
The Complete Pack

All seven templates — one price

The pick is the easy part. The plan behind it is what gets audited.

Superintendents Field Pack — Complete Bundle

  • Critical Lift Plan $49
  • Site-Specific Safety Plan $59
  • Job Hazard Analysis $29
  • Toolbox Talk Pack — 12 Talks $29
  • Three-Week Look-Ahead Schedule $24
  • Superintendent Daily Report $19
  • Pre-Pour Concrete Checklist $19

Every template is available now — check out through Stripe and your files are emailed to the email address you use at checkout, usually within an hour of payment. Word and Excel files are fully editable, PDFs are fillable. Buy once, use on every project, no subscription. If you don’t see your files, check your spam folder. Questions or delivery help: frankrizzoberg@gmail.com.

$228 bought separately
$129
Save $99
Get the Complete Pack — $129

Files delivered by email after checkout — not an instant download. Secure card checkout through Stripe.

The Pack — 7 Templates

Buy one, or buy the pack

Buy any single template on its own, or get all seven in the Complete Pack for $129. Files are delivered by email after checkout.

01Flagship

Critical Lift Plan

For any pick over 75% of chart, near power lines, over occupied areas, or with multiple cranes.

  • Load weight & rigging configuration worksheet with gross-load math done for you
  • Crane setup: radius, boom length, chart capacity, percent-of-chart check
  • Ground conditions, matting, and outrigger loading section
  • Lift path, tag lines, signal plan, and wind/weather hold points
  • Crew roles and sign-off block — operator, rigger, signal person, lift director
Word · Fillable PDF · 6 pages
NEWFree

Lift Plan Builder

The free online companion to the Critical Lift Plan. Build the pick on your phone and print a finished, signable plan.

  • Gross load figured for you — load plus rigging, never the load alone
  • Live percent-of-chart meter — flags a critical lift at 75%, blocks the plan over 100%
  • Franklin's five checks baked in, carried onto the printed plan
  • Runs right in your browser — nothing you type is saved or sent anywhere
Free online tool · Print / save as PDF
02

Job Hazard Analysis

The daily JHA that holds up in an audit — task steps, hazards, and controls in the order the work actually happens.

  • Step-by-step task breakdown with hazard and control columns
  • Pre-loaded hazard prompts for the 20 most common heavy civil tasks
  • PPE matrix and required-permit checkboxes (hot work, confined space, energized)
  • Crew sign-in roster on the same sheet — no separate attendance chase
Word · Excel · Fillable PDF · 3 pages
03

Site-Specific Safety Plan

The document owners and GCs ask for at award. Structured to WSDOT/ODOT-style expectations and owner safety manuals.

  • Full plan skeleton: responsibilities, emergency response, incident reporting
  • Sections for fall protection, excavation, cranes, electrical, and traffic control
  • Subcontractor flow-down language and orientation requirements
  • Fill-in project data sheet — swap the project, keep the plan
Word · 24 pages
04

Superintendent Daily Report

Manpower, quantities, equipment, delays — the daily record that wins arguments six months later.

  • Crew and headcount by contractor, with hours
  • Work completed with installed quantities, tied to bid items
  • Delay and impact log with weather, inspections, and visitors
  • Photo log reference block and tomorrow’s plan line
Word · Excel · Fillable PDF · 2 pages
05

Three-Week Look-Ahead

The rolling schedule format owners actually read — activities, constraints, and who owns each one.

  • Week-by-week activity grid with crew and equipment loading
  • Constraint log: RFIs, submittals, materials, permits, inspections
  • Milestone and outage/closure window callouts
  • Prints clean on one 11×17 sheet for the job trailer wall
Excel · PDF · 11×17 layout
06

Pre-Pour Concrete Checklist

Everything verified before the first truck is called — forms, rebar, embeds, and the pour plan itself.

  • Formwork, rebar, and embed verification sign-offs
  • Mix design, testing, and cylinder plan confirmed up front
  • Placement method, pump/bucket setup, and contingency for a breakdown
  • Curing, protection, and post-pour inspection block
Word · Fillable PDF · 2 pages
07

Toolbox Talk Pack — 12 Talks

A month of weekly talks, written in field language: crane safety, fall protection, excavation, heat illness, silica, electrical awareness, backing & spotters, rigging inspection, hand tools, trench egress, fatigue, and winter work. Each talk is one page with a sign-in roster on the back.

Word · PDF · 12 × 2 pages
08New

Bilingual Toolbox Talk Pack — English / Spanish

The 12 talks in English and Spanish, side by side on the same sheet — the whole crew hears the same talk and signs the same roster, in the language they work in.

  • All 12 talks: crane safety, fall protection, excavation, heat illness, silica, electrical awareness, backing & spotters, rigging inspection, hand tools, trench egress, fatigue, and winter work
  • Each talk runs 2 content pages plus a bilingual sign-in roster page
  • Plus a bilingual Job Hazard Analysis form — every field labeled in both languages
Word · PDF
09New

Russian Toolbox Talk Pack — English / Russian

The 12 talks in English and Russian, side by side on the same sheet — the whole crew hears the same talk and signs the same roster, in the language they work in.

  • All 12 talks: crane safety, fall protection, excavation, heat illness, silica, electrical awareness, backing & spotters, rigging inspection, hand tools, trench egress, fatigue, and winter work
  • Each talk runs 2 content pages plus a bilingual sign-in roster page
  • Plus a bilingual Job Hazard Analysis form — every field labeled in both languages
Word · PDF
10New

Jobsite Safety Signs Pack — English / Spanish

Twenty finished jobsite safety signs, ready to print — the ones a safety walk asks for first, in the formats and colors inspectors expect. Every sign in English and Spanish, so the whole site reads the same message.

Preview of six jobsite safety signs from the pack

Preview — 6 of the 20 signs. Every sign also comes in Spanish.

  • 20 finished signs in the standard OSHA signal-word formats — DANGER, WARNING, CAUTION, and NOTICE — with the correct colors
  • Every sign in English and Spanish — 40 print-ready PDFs at true 10×14 in size
  • Plus combined all-English and all-Spanish files, for printing the whole set in one run
  • Printing & mounting guide included: print at 100% for 10×14, or on 11×17 — then laminate or mount on sign blanks
PDF · 40 signs + 2 combined files
11New

Bilingual Field Pack — English / Spanish

The five core field templates in English and Spanish, side by side on the same form — the paperwork the office audits, in the languages the crew actually works in.

  • All five core templates in bilingual editions: Critical Lift Plan, Site-Specific Safety Plan, Superintendent Daily Report, Pre-Pour Concrete Checklist, and the Three-Week Look-Ahead spreadsheet
  • Every label, section header, and checklist line in English and Spanish side by side — one form the whole crew can read
  • Word and fillable PDF for the four documents; the look-ahead in Excel, same as the English editions
  • Files emailed to you after checkout, usually within an hour of payment
Word · PDF · Excel
12New

Russian Field Pack — English / Russian

The five core field templates in English and Russian, side by side on the same form — the paperwork the office audits, in the languages the crew actually works in.

  • All five core templates in bilingual editions: Critical Lift Plan, Site-Specific Safety Plan, Superintendent Daily Report, Pre-Pour Concrete Checklist, and the Three-Week Look-Ahead spreadsheet
  • Every label, section header, and checklist line in English and Russian side by side — one form the whole crew can read
  • Word and fillable PDF for the four documents; the look-ahead in Excel, same as the English editions
  • Files emailed to you after checkout, usually within an hour of payment
Word · PDF · Excel
Look Inside

Look inside the lift plan

A filled sample page, so you can judge the format before you spend a dollar.

Most lift plans fail review for the same reasons: the gross load never got totaled, the percent-of-chart was guessed, or nobody signed the roles. This template is laid out so those gaps are impossible to skip — the math blocks sit in the order a lift director works them.

Gross load worksheetLoad, rigging, block, and deductions on one block, totaled before the chart comes out.
Percent-of-chart checkFlags the lift as critical automatically past 75%.
Hold pointsWind limits, power-line clearance, and ground-bearing checks with stop-work lines.
Sign-off blockLift director, operator, rigger, and signal person, each with certification lines.

The other six templates follow the same discipline: the fields are the ones an auditor, an owner, or a court would ask for — in the order the field produces them.

Written for the work he knows best — substation foundations and steel, like the five BPA and Idaho Power substations on his record.

FORM LP-01 · SAMPLE — FILLED EXAMPLECritical Lift Plan
Project / locationRiverbend Substation — Bay 3 transformer set
Load descriptionPower transformer, dry weight per nameplate
Load weight38,400 lb
Rigging weight620 lb (2-leg bridle, 60° angles)
Block / hook1,150 lb
Gross load40,170 lb
Crane / configuration90-ton RT, 105 ft boom, full outriggers on mats
Max radius42 ft
Chart capacity at radius49,800 lb
Percent of chart80.7% — CRITICAL LIFT (>75%)
Wind hold pointStop work at 20 mph sustained
Ground / mattingCompacted gravel pad, 8×16 ft timber mats, bearing verified
Lift Director — sign / date 
Operator — sign / date 
Rigger — sign / date 
How Buying Works

How buying works

No accounts, no subscription, nothing to install. Every template and the Complete Pack are available now through Stripe.

Step 1

Pick your templates

Buy a single template on its own, or the full pack at $129 — $99 less than buying all seven separately.

Step 2

Pay once

Card checkout, one payment. The files are yours — use them on every project, for as many crews as you run.

Step 3

Delivered by email

Your files are emailed to the email address you use at checkout, usually within an hour of payment. If you don’t see them, check your spam folder. Still not there? Email frankrizzoberg@gmail.com for help. Then fill them in, print them, and put your company name on them.

Questions

Questions

The things foremen and safety managers ask before buying.

How do I get my files after I pay?

Your files are emailed to the email address you use at checkout, usually within an hour of payment. If you don’t see them, check your spam folder. If they’re still not there, email frankrizzoberg@gmail.com and we’ll get them to you.

What formats do the files come in?

Editable Word and Excel files you can put your company name and logo on, plus fillable PDFs for crews working from a tablet or phone. One purchase covers all formats listed on each template.

Can my whole company use them?

Yes. One purchase covers every crew and project in your company. What you can’t do is resell the files or post them for download elsewhere.

Do these replace a safety professional or an engineer?

No — and they’re not sold that way. They’re field-proven starting documents. Every plan still has to be reviewed and adapted to your site by a competent, qualified person. See the note at the bottom of this page.

Are they written for a specific state or owner?

The structure follows OSHA and ASME expectations and the way WSDOT/ODOT-style owners review submittals, which is where they were used. Project-specific requirements still get filled in per job — that’s what the fill-in sections are for.

What if a template doesn’t fit my work?

Email within 14 days of purchase and say what didn’t fit — you’ll get a refund or a corrected version, whichever you’d rather have.

Can I get one customized for my company?

Yes — pre-loaded with your company info, your project list structure, and your owner’s formats. That’s consulting work, and it starts with an email.

Free — Every Two Weeks

The Field Letter

A written letter for superintendents and foremen — one practical lesson from 28 years in heavy civil, in your inbox every two weeks. No hype, no spam, unsubscribe anytime.

Read before you rely on any template: These documents are starting points written from field experience. They are not engineering, not legal advice, and not a substitute for a site-specific plan reviewed by a competent, qualified person. Critical lift plans in particular must be reviewed by a qualified lift director and, where the lift requires it, a licensed engineer, and must follow ASME B30 and P30 standards and OSHA 29 CFR 1926 Subpart CC as they apply to your lift. Verify every load weight, chart capacity, and ground condition on your own equipment and your own site before any pick.